|
[1] Long, S. Meng, L. Miao, J. Hong, X. Corman, F.Synchronizing last trains of urban rail transit system to better servepassengers from late trains of high-speed railway lines, Networks and SpatialEconomics. 2020(20): 599–633. (SCI/SSCI) [2] Long ,S, Luan, X. Corman, F. Passenger-orientedRescheduling of Trains and Rolling Stocks for Handling Large Passenger Demand:Linearized Models with Train Capacity Constraint. Transportmetrica b-TransportDynamics, 2021(9):1,641-672. (SCI/SSCI) [3] Long ,S. Meng, L. Luan, X. Trivella, A. Miao, J.Corman, F. A Stochastic Programming Approach for Scheduling Extra Metro Trainsto Serve Passengers from Uncertain Delayed High-Speed Railway. Journal ofAdvanced Transportation, https://doi.org/10.1155/2020/8894174 (SCI) [4] 龙思慧, 孟令云, 王义惠, 栾晓洁, 张鹏. 高速列车运行调整与运行控制一体化双目标优化模型与算法. 交通运输系统工程与信息, 2020,20(06):163-169. (EI) [5] Long ,S. Meng, L. Wang, Y. Miao, J. Li, T. Corman,F. Train Rescheduling Optimization model with considering the Train Control forA High-Speed Railway Line under Temporary Speed Restriction. The IEEEIntelligent Transportation Systems Society Conference. 2019: 2809-2816. (EI) [6] Long, S. Meng, L. Corman, F. Hong, X. Li, X.Optimizing Schedule of extra metro trains to serve delayed passengers fromhigh-speed trains. Proceedings of the 98rd Transportation Research Board (TRB),Washington DC, US, 13th-17th of January, 2019. [7] 孟令云,王义惠,龙思慧,李璇. 临时限速下的高铁列车运行调整与驾驶控制一体化优化方法[P]. 发明专利:2020.09.15,中国,ZL201910477032.3 [8] 孟令云,王义惠,苗建瑞,李璇,龙思慧. 基于准移动闭塞的轨道区段锁闭时间计算方法[P] . 发明专利:2021.04.13,中国,ZL201910497181.6 [9] Hong, X. Meng, L. Corman, F. Veelenturf, L. Long,S. D’Ariano. Integrated Optimization of Capacitated Train Rescheduling andPassenger Reassignment under Disruptions. Transportation Research Part C:Emerging Technologies. 2021(125): 103025. (SCI) [10] Hong, X, Meng L, Corman F., D’Ariano A.,Veleenturf, L. Long ,S. Robust Capacitated Train Rescheduling with PassengerReassignment under Stochastic Disruptions. Transportation Research Record.(SCI) |